Installing a New Playground? Here’s How to Avoid Expensive Rework


De-Risk Your Playground Investment in 3 Steps

The biggest risk in playground projects isn’t usually the budget.


It’s discovering after installation that the equipment, surfacing, or layout doesn’t comply with NZS 5828, creating expensive rework, delays, safety concerns, and potential liability.


After inspecting thousands of playgrounds across New Zealand, we continue to see the same pattern:

Projects are approved based on brochures, supplier claims, and good intentions — only for compliance issues to emerge after installation.


Here’s how to reduce that risk.


1. Verify Compliance Before You Purchase

Not all playground equipment marketed in New Zealand has independent evidence of compliance.


Before committing, ask for:

✔ Independent third-party certification

✔ Evidence of conformity to NZS 5828 / EN 1176

✔ Impact attenuation certification for surfacing

✔ Technical drawings showing fall heights, free space and impact areas


A supplier declaration alone is not evidence of compliance.


The earlier compliance is verified, the cheaper problems are to fix.


2. Review the Design Before Construction

Many playground compliance failures occur long before the first post is installed.


Common issues include:

• Impact areas overlapping pathways or obstacles

• Insufficient surfacing depths

• Entrapment hazards

• Non-compliant barriers and guardrails

• Accessibility oversights

• Equipment positioned too close together


A pre-installation design review can identify these issues before construction begins, avoiding costly modifications later.


3. Independently Audit the Completed Playground

Even well-designed playgrounds can encounter issues during installation.


Changes on-site, construction tolerances, surfacing variations and contractor substitutions can all affect compliance.


An independent post-installation audit verifies:


✔ Equipment installation compliance

✔ Surfacing performance and critical fall height requirements

✔ Free space and impact area requirements

✔ Entrapment and entanglement risks

✔ Overall compliance with NZS 5828


Most importantly, it provides documented evidence that due diligence has been undertaken before the playground is opened to the public.


A Playground Is Only as Compliant as Its Final Inspection

The most expensive playground isn’t the one with the highest purchase price.

It’s the one that requires remediation after opening, creates avoidable risk, or becomes the subject of an injury investigation.


The best projects follow a simple process:

Specify correctly. Review independently. Verify before opening.


That’s exactly where Playsafe fits.Post-Install Inspection


What stage is your next playground project at — concept design, procurement, construction, or final certification?




 
 
 

Comments


Questions about play safety?

Are you responsible for the safety of children in playgrounds and play areas? Do you want to ensure they can play and explore without fear of harm or injury?

Then you need "Play Safe - THE ULTIMATE GUIDE TO Children's Play Safety and NZS 5828 Playground Equipment and Surfacing Standards." This comprehensive handbook is essential for safeguarding children's play environments.

PLAYSAFE_102-min.jpg
PLAYSAFE LOGO HORIZONTAL

Playsafe Ltd

NZBN: 9429046546753 

29A Hannigan Drive, St Johns Auckland 1070

New Zealand

GET IN TOUCH
WE'D LOVE TO HEAR FROM YOU
  • Facebook
  • Instagram
Copyright 2026 - Playsafe Ltd
bottom of page